New Hall Solar Farm

Project timeline
The project
Helping to resolve the UK’s energy crisis and accelerating the transition to net zero through a renewable energy development near Wakefield.
Downing is currently in the pre-construction phase for 22.2MW solar project near Wakefield, West Yorkshire having acquired the project in 2025. Construction is expected to start in November 2026.
Once constructed New Hall Solar Farm will produce enough energy to power up to 8,117 UK homes annually. The project will make a direct contribution to the UK’s Net Zero goals. Transitioning to a renewable energy generation system should mean cheaper energy bills for the UK consumer, and solar power is one of the cheapest forms of renewable energy.
Latest updates
New Hall Solar Farm was consented June 2025. The planning application can be seen with the following reference number: APP/X4725/W/24/3354032
Creating a sustainable future
As well as being renewable and low carbon, solar power is one of the cheapest forms of energy for the U.K. A fivefold increase in installed solar capacity is needed by 2050 according to the Government’s Energy Security Strategy (2022) and these projects will help the U.K. accelerate the transition to Net Zero.
We have a long-term vision for the site which helps to address the UK’s energy crisis, provides a substantial biodiversity net gain and supports farmers, local agriculture and the local community.
Forming a strong relationship with the community that we serve is important to us and we are continually exploring ways we can better support local initiatives. We value your feedback and try to reflect it in the way the project is designed, like the inclusion of permissive pathways and the retention and creation of wildlife habitats. If you do have any thoughts on how we can improve our proposals, please do get in touch.
%201.png)

.jpg)

















%201.png)